.jpg)
The production and operation entities in the Shatin petrochemical industry cluster are often equipped with conventional fixed operation vehicles on a daily basis, but after entering the centralized maintenance stage, there are often short-term operation vehicle gaps. The petrochemical plant is a clear high-risk fire and explosion-proof operation scenario, and ordinary forklifts do not meet the entry operation specifications. If non-compliant vehicles are used to carry out maintenance and handling operations, it is easy to trigger safety hazards and bring unnecessary obstacles to the progress of the overall maintenance period.
Combined with the common use of vehicles during the maintenance period of Shatin Petrochemical, most enterprises face several common pain points: First, the flexibility of the vehicle cycle is high, and the maintenance time is often dynamically adjusted according to the actual progress of equipment investigation and maintenance. The shortest time is one or two weeks or one or two months. If you directly purchase a new explosion-proof forklift, not only will the upfront investment cost be higher, but the idle rate of vehicles will also increase significantly after the maintenance period, and the resource utilization rate will be extremely low. Second, vehicle compliance requirements are strict, forklifts entering the explosion-proof area, electrical components, fuselage protection level and other parameters need to meet the entry audit requirements of the petrochemical plant, many temporary deployment of non-compliance modified vehicles, completely unable to pass the safety qualification verification of the plant, do not have the qualification for entry operations.
In response to the special vehicle needs of various production enterprises in the Shatin petrochemical area during the maintenance period, BYD's explosion-proof forklift special project leasing service can accurately match the usage requirements of the corresponding scene, and all vehicles put into service comply with the relevant national explosion-proof vehicle safety regulations. It can be adapted to the operation requirements of various maintenance scenarios such as flammable and explosive material transfer in petrochemical plants, heavy equipment parts handling, and fixed-point distribution of maintenance materials.
This kind of special project leasing service can flexibly match the lease period according to the actual maintenance period of different enterprises. It can be customized on demand from single-day temporary deployment to monthly long-term on-site, and does not require the lessee to bear the cost of additional annual vehicle inspections and regular maintenance. Before the vehicle enters the factory, the service party will cooperate with the lessee to organize and submit all relevant qualification documents in advance to ensure that the vehicle passes the admission safety audit of the factory at one time. At the same time, the driver service that has been trained for special projects is optional, and the company also supports its own qualified drivers to operate the vehicle. If the vehicle has a routine failure during the service period, the exclusive operation and maintenance personnel will arrive at the scene within the agreed time limit to minimize the impact on the progress of the maintenance operation.
For each business entity of Shatin Petrochemical, choosing a special project explosion-proof forklift leasing service with compliance during the maintenance period can not only effectively control the cost of vehicle use in stages, but also completely avoid various safety risks caused by vehicle non-compliance, and provide reliable vehicle support for the smooth and efficient advancement of maintenance work.
